Hawaiian dredging11/14/2023 (mechanical/plumbing engineer) A-1 A-Lectrician (electrical engineer) DETAILS 30,000 sf Total cost $9. The project achieved LEED Gold certification.īUILDING TEAM Mason Architects (submitter, architect) Hawaiian Dredging Construction (owner, GC) Baldridge & Associates (SE) Dorvin D. Wood-block flooring from the print press shop was salvaged for use in the second-floor executive lobby. The sprinkler heads required for the lobby were concealed by running the water line through the overhead floor, as the decorative ceiling in the lobby was directly applied to the structural concrete floor. The team conducted careful restoration work on the terra cotta cladding, decorative interior frescos, two interior light posts, and classical balusters at the entry. The southern elevation that had been removed during the press room demolition was rebuilt to match the detail of the historic façade. The contractor and the design firm, Mason Architects, collaborated with the preservation board to replace the original windows with high-efficiency aluminum units to match the original steel windows. The GC snatched up the Advertiser Building in 2016 with plans to restore the structure. It was in bad shape, with no solid plans for its next life.īy chance, Hawaiian Dredging Construction Company, the contractor for 801 South Street, was looking for a new headquarters. The two-story printing press shop had to be demolished, but the main historic structure was still somewhat intact. The condo development, 801 South Street, was completed in 2015 (Tower A) and 2017 (Tower B). In 2012, developer Downtown Capital purchased the 3.7-acre property for $22 million with plans for two condo towers sandwiching a large parking structure. There it would sit for seven years, during which it was designated a Most Endangered Site by the Historic Hawaii Foundation. Evaluate their financials based on Hawaiian Dredging. In the 1990s, the owner, Gannett Pacific, put the property on the market. See Hawaiian Dredging Construction Company funding rounds, investors, investments, exits and more. It is listed on both the National Register and the State Register of Historic Places. The three-story structure features a distinctive mint-green terra cotta exterior, Spanish-tile hipped roof, and twin roof towers. The command expects work to occur in Hawaii through September 2027 and is obligating $463 million in fiscal 2023 military construction funds.Īccording to DOD, the task order contains three options that could bring the award’s total value to $3.4 billion if exercised.Once home to the Honolulu Advertiser-the city’s largest daily-this 1929 Beaux Arts–style building has been a landmark in Honolulu’s Kakaako neighborhood for nearly 90 years. Pacific Fleet’s nuclear-powered submarines. The Navy said the planned project will replace Dry Dock 3 with a new graving dock, dubbed Dry Dock 5, meant to help the Pearl Harbor Naval Shipyard improve its capability to maintain and modernize the U.S. In 2021, NAVFAC Pacific awarded five companies spots on the potential $8 billion multiple-award, indefinite-delivery/indefinite-quantity contract in support of the Shipyard Infrastructure Optimization Program, which seeks to integrate industrial plant equipment and other infrastructure investments at the service branch’s four public shipyards to meet requirements for nuclear fleet maintenance. The Naval Facilities Engineering Systems Command Pacific is the contracting activity and received four proposals for project, as part of a contract awarded in November 2021, the Department of Defense said Friday.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |